Hi All,
I am having a issue with 'calculated finish date' from view 'viewdata' for a project. When we are saving this data from portal it is saving in ECC catsdb table with 1 day more (Ex: if we are saving as 02/24/2014 in portal, it is saving as 02/25/2014 in ECC). When I am trying to read this date into CAT2 tcode I am seeing the date with 1 day more. But when I pull the same project in portal it is showing the correct value that we saved (without adding 1 day more).
While reading the data into CAT2 tcode I can subtract '1' and the original data. But i want to know how the data is ulling correctly on portal so I can use the same method while I am trying to read to CAT2 tcode.
Any help/documents/link is appreciated.
Thanks in advance,
Karuna