Hi Gurus!
I have a problem with the integration between SAP PPM 6.1 and SAP PS.
When an item is saved it automatically creates the project in SAP PS and contacted Decision Point and WBS elements and associated element and project definition. Table rpm_obj_link I reflected on the picture 1. Communication occurs by means of 0inmpspd and 0inmpswbs.
My system is set horizontal synchronous data synchronization between PS and PPM.Shown in the picture 2.
Data from SAP PS from the Definition project being delivered over to the element of the PPM - no problem.Also, data is transferred from SAP PS WBS elements at the Decision Point making.
The problem occurs when I try to transfer data from one decision point in the WBS element.
When you first click on save at the Decision Point, the system informs that all data stored, but the data is not reached to SAP PS. When you second press save, the system reports that the project is locked by the user, but sends the data to SAP PS.
I would like to transfer data without an error notification and the first time.
What could be the problem?