PPM-PS Item link

$
0
0

Good day,

I have the same problem as the Franco (PPM Item link to PS - LPD_CUST - Open linked PS Project)

 

I want to open directly the PS Project by calling a transaction from PPM. I can see the initial screen of the transaction. I have tried with CJ20N and OLR3_CJ20N.

 

Problem is that the user has to input manually the PS Project. I have checked out the 'Make settings for calling an SAP transaction' and everything has the default configuration.

 

After trying with several choices (in source and target parameter), we have left the following configuration (but still does not works):

 

Transaction LPD_CUST

 

Снимок экрана 2016-01-18 в 16.23.57.png

 

Parameter Mapping

 

Parameter+Mapping+-+LPD_CUST+-+RPM_RIH+OIF+-+Blank.jpg

 

I considered in target parameter the parameter for service 0CJ20NPROJD (follow below the config).

 

Make+settings+for+calling+SAP+transaction+-+0CJ20NPROJM.jpg

 

We did a test where we specified an override 'Fixed Value" and the target field is filled when we execute the launchpad. We still have problems with the source parameter.

 

Also, after executing with the Fixed Value, the transaction is not executed automatically (I understand it should).

 

Thanks in advance,

Kirill