I did the integration configuration between PPM And ECC standalone systems to bring in the costs from ECC to PPM Financial Planning.
Created PS Project manually not automaitcally from PPM.
Assigned PS Project definition and underlying WBS elements as object link to Item. Assigned PS Project definition as object link to Project.
Receiving 2 errors:
1. In "Account Assignment' tab in the Project, I manually assign the PS Project definition to the PPM Project definition.
On Save: "Rollback: Account assignment must be reset"
2. I run - /RPM/FICO_INT_PLANNING
Application log: "No link exists between SAP PS Project element and selected SAP PPM items"
Not sure if the second error is due to the 1st one.
Please guide.