We are on PPM 6.0.
We are required to show the costs posted in cost center, into the Financial Planning View.
We do not have a PS WBS to pull these costs from.
In summary, the opex costs posted onto cost centers are to show in SAP-PPM, without the PS WBS to pull that cost from.
What os the way out?